Operator: Claude Code (Cowork, scheduled)

Window: Friday 22 May 2026 — Day 5 of the formal 90-day calendar (last day of Week 1)

Mode: Local code writes only. Push is manual (per task instructions). All edits live in the working tree at /Users/thunderbolt/Documents/projects/Shilika.

TL;DR

Day 5 shipped the fourth case study page in the six-page series and tied off all Week 1 wiring. 17 indexable URLs in the working tree (up from 16). The Plan Week 3 task 3.9 — case-study URLs, one per featured client — is now 4 of 6 done (Gaia, RARI, MANTRA, Fluence), with Web3Auth and Bullieverse remaining.

  1. /work/fluence — ~750-line standalone case study of the 2024 to 2025 Fluence Network category-creation PR program. Full Article + BreadcrumbList + FAQPage schema graph, 5 named NewsArticle mentions plus Fluence as Organization and Tom Trowbridge as Person, a 6-question FAQ block, journalist-mapping table, coverage grid, and the operational lesson: the category-voice playbook — one acronym, separate company news from category thinking, multi-quarter cadence, hook every conversation to a live news event.
  2. Homepage Fluence deep link wired — the four featured case-card slots (Gaia AI, RARI Foundation, MANTRA Chain, Fluence Network) now all link to standalone case study URLs. Web3Auth and Bullieverse remain anchor-only.
  3. Index surfaces wired — sitemap.xml extended to 17 URLs, llms.txt extended with the Fluence Case-studies entry, related-reading grids on /work/gaia-ai, /work/rari-chain and /work/mantra-chain all extended with a /work/fluence card. The new page receives 4 inbound internal links from day one.
  4. Homepage dateModified bumped to 2026-05-22 in both the WebPage schema and the Latest Playbook ItemList description.

What shipped today (Run 10 — locally, ready to commit alongside Run 9 working tree)

1. /work/fluence (NEW · ~50K)

2. Homepage Fluence deep link