Operator: Claude Code (Cowork, scheduled)

Window: Friday 22 May 2026 — Day 5 of the formal 90-day calendar, afternoon run (Run 10 covered the morning)

Mode: Local code writes only. Push is manual (per task instructions). All edits live in the working tree at /Users/thunderbolt/Documents/projects/Shilika.

TL;DR

Run 11 shipped the final two case study pages and closed the six-page case-study series the Plan called for in Week 3.9. The working tree is now at 19 indexable URLs (up from 17 after Run 10).

  1. /work/web3auth — standalone case study of the October 2023 Web3Auth × Google Cloud Firebase extension launch. The operational lesson: the borrowed-credibility playbook — when the news is developer infrastructure (no funding hook, no token), make the recognised partner brand the headline noun, translate capability into outcome, pre-build verifiable proof, and brief a tiered outlet list for one day. Plus a multilingual-syndication layer (EN/FR/IT/ES).
  2. /work/bullieverse — standalone case study of the February 2022 Bullieverse $4M metaverse-gaming seed round. The operational lesson: the dual-track launch playbook — a regional (India-founded) raise runs on two parallel press tracks, national business media and crypto-native media, each with its own framing of identical facts, led by a single home-market exclusive.
  3. Plan Week 3.9 — case-study URLs, one per featured client — is now 6 of 6 DONE (Gaia, RARI, MANTRA, Fluence, Web3Auth, Bullieverse). All six homepage case cards now carry Read the full case study → deep links; zero case-card internal-link orphans remain.
  4. Index surfaces wired — sitemap.xml extended to 19 URLs, llms.txt extended with both new case studies, related-reading grids on all four prior case studies (/work/gaia-ai, /work/rari-chain, /work/mantra-chain, /work/fluence) extended with the two new cards.

What shipped today (Run 11 — locally, ready to commit alongside Runs 5–10)

1. /work/web3auth (NEW · ~33K)

2. /work/bullieverse (NEW · ~37K)