Operator: Claude Code (Cowork, scheduled)
Window: Wednesday 20 May 2026 — Day 3 of the formal 90-day calendar, afternoon run
Mode: Local code writes only. Push is manual (per task instructions). All edits live in the working tree at /Users/thunderbolt/Documents/projects/Shilika, ready to commit alongside the Run 5 + Run 6 + Run 7 untracked changes.
Run 8 is the second pass on Day 3, picking up the work Run 7 explicitly pulled forward (D4.6 — Build /work/rari-chain) plus a deeper AEO sweep across the three older articles that did not yet carry FAQPage schema. Three concrete deliverables landed locally:
/work/rari-chain — 638-line standalone case study page with full Article + BreadcrumbList + FAQPage schema graph, 6 named NewsArticle mentions (CoinDesk, The Block, The Defiant, Cointelegraph, CryptoNews, plus RARI Foundation as Organization), 6-question FAQ block, named launch-day timeline (T-9 through T+24), journalist mapping table, full coverage grid linking to all 5 named outlets, and the operational lesson (category framing > L2 launch announcement)./article-1, /article-2, /article-3 — these three articles previously carried only BlogPosting + BreadcrumbList. Each now carries a 5-question FAQPage block matching the article's H2 stack, with mid-2026 stats (48% AI Overview coverage, 48% earned-media share of LLM brand citations, Princeton GEO citation uplift) embedded in the answer text where relevant. All three dateModified bumped from 2026-05-17 to 2026-05-20 for the Perplexity freshness signal./work/rari-chain). llms.txt added the RARI entry under ## Case studies. blog.html bumped all three older-article dateModified entries.Day 3 calendar tasks from the 90-day plan (Plan Week 1, Wed 20 May): Set up Bing Webmaster Tools [SJ], Authenticate Ahrefs MCP [SJ], Pull Ahrefs Site Explorer baseline [CC], Pull Ahrefs Keyword Explorer data for 25 keywords [CC]. The two CC tasks remain blocked (Ahrefs Insufficient plan per Run 7); the two SJ tasks remain open from Day 1/2 carry-over. Day 3 reprioritised onto the next-highest-leverage pulled-forward work, as Run 7 already did this morning.
/work/rari-chain (NEW · 638 lines · ~46K)mentions (RARI Foundation as Organization + 5 NewsArticle entities for CoinDesk/The Block/The Defiant/Cointelegraph/CryptoNews with publisher + datePublished 2024-01-18)citation array with 5 outlet URLsabout array with 4 Things (RARI Chain, NFT royalty enforcement, Arbitrum L2, Mainnet launch PR)#person entity.timeline-box — for case studies that need a play-by-play); the operational lesson that the campaign is won in the embargo, not on launch day/services/ai-startup-pr not relevant for RARI (Web3, not AI); relates to /work/gaia-ai, /article-5 (CoinDesk pitch guide), /article-4 (pricing), /article-7 (best-of listicle)/article-1 AEO upgrade — FAQPage schema added