Operator: Claude Code (Cowork, scheduled)

Window: Thursday 21 May 2026 — Day 4 of the formal 90-day calendar

Mode: Local code writes only. Push is manual (per task instructions). All edits live in the working tree at /Users/thunderbolt/Documents/projects/Shilika, ready to commit alongside the Run 5 + 6 + 7 + 8 untracked changes.

TL;DR

Day 4 picked up the highest-leverage CC-actionable work from Run 8's task queue. Three concrete deliverables landed locally.

  1. /work/mantra-chain — 673-line standalone case study page. Article + BreadcrumbList + FAQPage schema graph. 8 named mentions (MANTRA, Shorooq Partners as Organizations + 6 NewsArticle entities for CoinDesk, Yahoo Finance, Entrepreneur Middle East, Lucidity Insights, AltcoinBuzz, Binance Square). 6-question FAQ block covering campaign overview, Middle East angle rationale, named-backers narrative engineering, time-zone unlock, fit for new engagements, and the difference between funding announcements and funding-round PR. Named launch-day timeline at 9 AM Gulf Standard Time (T-9 days through T+24 hours). New .backers-strip component class names all six syndicate members and the PR job each one carried.
  2. Article-1/2/3 lede rewrite — Direct answer boxes added. Each article now opens with a dark .answer-box block that front-loads a 50-word direct answer above the existing italic lede. This satisfies the Princeton GEO / Perplexity grounding finding flagged in Run 8: AI engines using real-time retrieval evaluate page relevance primarily on the first 200 words. The narrative ledes are preserved verbatim; the answer boxes sit above them. dateModified bumped from 2026-05-20 to 2026-05-21 across all three.
  3. Homepage MANTRA case-card deep link + sitemap.xml + llms.txt + blog.html — closes the MANTRA case-card internal-link orphan (Gaia closed Run 7, RARI closed Run 8, MANTRA closes Run 9). Sitemap grew from 14 to 15 URLs (added /work/mantra-chain). llms.txt added the MANTRA entry under ## Case studies and bumped Last updated to 2026-05-21. blog.html bumped the three article-1/2/3 dateModified entries from 2026-05-20 to 2026-05-21.

Day 4 calendar source tasks from the 90-day plan (Plan Week 1, Thu 21 May): update robots.txt for AI crawlers [CC], draft/publish llms.txt [CC], audit canonical tags [CC], verify hreflang absent [CC]. The first three were already complete from Runs 3–8; today's audit confirmed: 15/15 pages carry correct canonical tags, robots.txt explicitly allows 19+ AI crawlers including GPTBot, OAI-SearchBot, ChatGPT-User, ClaudeBot, PerplexityBot, Google-Extended, Applebot-Extended, cohere-ai, Mistralai-User. hreflang correctly absent until regional pages ship Week 10.

What shipped today (Run 9 — locally, ready to commit alongside Runs 5/6/7/8)

1. /work/mantra-chain (NEW · 673 lines · ~51K)

2. Article-1 lede rewrite — Direct answer box added